Quick Summary
Choosing between Extension Factory vs Daslo depends on your project scope, how you want to be kept informed, and your comfort with the building process. Compare each builder’s quote line by line, check registration and insurance, and confirm what each price excludes before deciding.
Last Updated: 7 November 2026
Choosing between extension factory vs daslo comes down to what your project needs, how you want to be kept informed, and how comfortable you are with the building process. This guide sets out the practical differences so you can shortlist with confidence. We have not been able to verify detailed, current independent reviews of these two builders from the research available to us, so this article focuses on the questions and checks that matter whichever builder you choose.
A home extension is a building project that adds floor area to an existing house, usually at the rear, the side or upstairs. Knockdown and rebuild means demolishing an existing home and building a new one on the same block. Both are larger undertakings than a simple renovation, and the builder you pick shapes the outcome.
Before comparing any two builders, write down your scope, your budget range and your timeline. A builder who suits a small rear extension may not suit a second-storey addition, and the reverse is also true. Use the sections below as a checklist to hold each builder’s proposal against.
Start by confirming that a builder regularly does the type of work you need. Ask for examples of completed projects of the same scale, not just a portfolio of finished kitchens or bathrooms.
Rear extensions and ground-floor additions are the most common project type. They typically involve changes to foundations, roofing and the connection to the existing structure. Second-storey additions add structural and planning complexity, because the existing frame must carry new loads. Knockdown and rebuild projects involve the full demolition and reconstruction process.
Ask each builder which of these they handle in-house and which they subcontract. Ask who will manage the site day to day. You want a clear answer, not a general promise to “handle everything”.
No two extension quotes are directly comparable unless they describe the same scope, the same allowances and the same exclusions.

Start by asking both Extension Factory and Daslo Constructions for a quote broken into the same cost categories, so you can compare line by line rather than on the bottom-line total. A useful breakdown looks like this:
Why extension costs vary so much. The same rear extension can be quoted at very different totals because of site access (a narrow side driveway changes how materials are handled), the age and condition of the existing structure, whether the roof is reconfigured or extended, the span of the new opening, and the level of finish selected. Second-storey additions usually cost more per square metre than ground-floor work because the existing frame and footings must be assessed and often strengthened.
Allowances and provisional sums are where quotes diverge. A low total often hides a low allowance for tiles, tapware, windows or kitchen joinery. Ask each builder what specification their allowance assumes, and what happens if your selections exceed it. A provisional sum is an estimate for work that cannot be priced precisely until the site is exposed; ask how the builder adjusts the contract price when the actual cost differs, and whether they take a margin on the adjustment.
Fixed price versus cost-plus. A fixed-price contract gives you certainty if the scope is fully documented, but it usually carries a higher base price to cover the builder’s risk. A cost-plus arrangement can be cheaper on a well-defined job but exposes you to price movement. Ask each builder which model they prefer for your project type and why, and ask what is excluded from the fixed price, rock excavation, asbestos removal, service upgrades and council requirements are common exclusions.
Variations. Ask both builders how variations are priced, whether a margin is applied, and whether written approval is required before work proceeds. A builder who cannot explain their variation process in plain terms before you sign is a risk.
How to compare the two proposals. Put both quotes into a single spreadsheet with the same categories in the same order. Mark every item as included, excluded or allowance-only. Then ask each builder to confirm, in writing, the assumptions behind their allowances and the conditions that would trigger a variation. Only then compare totals.
Watch out: a quote that is dramatically lower than the other usually reflects a narrower scope or a lower allowance, not better value, confirm what is missing before you treat it as the cheaper option.
Request a written, itemised quote from each builder so you can run it through the same comparison process.
The article sets out the cost categories a builder’s quote should cover, so you can compare proposals line by line.
| Cost item | What to check | Why it matters |
|---|---|---|
| Allowances | Specification assumed | Low totals can hide low allowances |
| Provisional sums | How price is adjusted | Actual cost may differ from estimate |
| Fixed price | Stated exclusions | Rock, asbestos and service upgrades are often excluded |
| Cost-plus | Price movement exposure | Cheaper on well-defined jobs, riskier otherwise |
| Variations | Written approval required | Changes to scope are where budgets blow out |
| Narrow scope quote | Missing items | Dramatically lower quotes often mean less included |
This section gives you a repeatable way to verify a builder’s credentials. Run the same checks on each builder before you shortlist them.
Step 1: Confirm registration with the Victorian Building Authority. Residential building work in Victoria is regulated by the Victorian Building Authority (VBA). Ask each builder for their registration number and the category of registration they hold, then check it yourself on the VBA’s public register. Registration categories matter: a builder registered for domestic building work up to a certain value or class may not be registered for the scale of your project.
Step 2: Check insurance. Ask for a current certificate of currency for public liability insurance and confirm the policy is in the builder’s legal entity name, not a related company.
Step 3: Search dispute records. The VBA publishes disciplinary findings and decisions on its website. Search each builder’s name and any trading names. The Victorian Civil and Administrative Tribunal (VCAT) publishes many residential building decisions; a search of VCAT’s decisions database can reveal patterns in how a builder handles defects or payment disputes.
Step 4: Check the legal entity. Search the builder’s name on the Australian Securities and Investments Commission (ASIC) registers to confirm the company or business name, its ACN or ABN, its directors and its registration status (Company and organisation registers). Ask whether the entity quoting is the same entity that will sign the contract and hold the insurance. A mismatch is a warning sign.
Step 5: Ask for references you can actually contact. Request two or three recent clients with projects similar in scope to yours, and ask specifically about communication, variation handling and defect resolution. A reference that only speaks to the finished look is less useful than one that describes how problems were handled.
Step 6: Test the claims. Any statement about years in business, awards or guarantees should be backed by documents you can check, an award from a named body, a guarantee with written terms, or a registration history. If a claim cannot be verified, treat it as marketing rather than evidence.
Watch out: a builder who is reluctant to provide a registration number, certificate of currency or written contract terms before you commit is signalling a risk you should take seriously.
Use this six-step check on every builder you are considering, and keep the results in a single file so you can compare them objectively rather than relying on impressions from a sales meeting.
A written contract is your main protection. Before you sign, make sure it sets out the scope of works, the total price, the payment schedule, the start and completion dates, and the process for variations.
Payment should be tied to completed stages of work, not to dates alone. Victorian domestic building contracts are subject to statutory requirements, so ask the builder to confirm how their contract complies with the relevant Victorian legislation. Avoid paying large sums upfront.
Variations are where budgets often blow out. A variation is any change to the agreed scope. Ask how variations are priced, whether they must be approved in writing before work begins, and how long the builder takes to provide a quote for a change. A flexible builder explains this clearly before you start.
Ask what happens if the builder cannot finish the job. Find out whether there is a defects liability period, and how warranty and defect claims are handled after handover.
Timelines run in stages, and each stage can be delayed. Planning and building permit approvals can take several weeks or months depending on the complexity of the design and any council requirements. Construction then follows, and finishing work and inspections come at the end.
Ask each builder for a realistic programme that shows the major milestones: design sign-off, permit lodgement, approval, site start, structural completion, lock-up, fit-out and handover. Ask how they communicate delays and how often you will receive progress updates.
Be wary of very short timeframes presented without a clear explanation. Realistic programmes account for weather, trade availability and inspection stages.
Choose the builder whose project experience matches your scope, whose contract terms you understand, and whose communication style suits you. If you need a builder specialising in a specific type of work, compare the examples each firm provides against your own brief.
Your next step is to put the checklists above to each builder in writing. Request a detailed quote from Archibuilt through its website, then compare it line by line against your other options.
Compare builders on the same scope, not the headline price. Ask each for a written quote that lists materials, labour, site costs, provisional sums and allowances, then line the quotes up side by side. Check each builder’s licence with the Victorian Building Authority, confirm their insurance certificates, and ask for references from recent extension projects similar to yours. Use the builder comparison checklist in this article to keep the review consistent.
A useful quote itemises the scope of work, materials and finishes, labour, site preparation, council and building permit fees, engineering and drafting costs, and any provisional sums. It should state the payment schedule, how variations will be priced and approved, and what is excluded. Vague lump-sum figures make it hard to compare builders fairly, so request a detailed breakdown before you sign anything.
Ask how long they have been operating, how many extensions of your type they have completed, and whether you can speak to recent clients. Ask who will manage the project day to day, how often you will receive progress updates, and how changes are documented and priced. Also confirm their licence number, insurance cover, and how they handle disputes or defects after handover.
Timelines depend on the design stage, council approval, the scope of the build and weather. Planning and permit approval often run before construction starts, and the build phase itself varies with size and complexity. Ask any builder for a written programme with milestones, and check how delays and variations are reflected in the schedule before you commit.