Quick Summary
A fixed price building contract is an agreement where the builder commits to a set total price for the agreed work, so homeowners know the cost before construction starts. The price only changes for agreed variations or specific clauses in the contract.
A fixed price building contract is an agreement where the builder commits to a set total price for the work described. A fixed price model is designed so homeowners know the cost before construction starts.
In practice, the contract is a package: the price, scope of works, plans and specifications, payment schedule, and rules for changes. If any are vague, the fixed price stops meaning much.
Key parts of a fixed price contract:
With a fixed price contract, the builder carries the risk of cost overruns.
Here is how they compare:
| Feature | Fixed Price | Cost Plus |
|---|---|---|
| Final cost known upfront | Yes | No |
| Who carries cost overrun risk | Builder | Homeowner |
| Flexibility for changes | Limited, through variations | High |
| Budget control | Strong | Depends on oversight |
| Best for | Defined projects with clear plans | Projects still being designed |
A fixed price suits most homeowners with finished plans and a set budget. Cost plus can work while the design is still changing, but needs close tracking and regular cost reports.
Watch out: a fixed price is only as firm as its scope. If plans are incomplete, the builder may price missing items later as variations.
The contract sum covers everything the scope of works names: labour, standard materials, site setup, waste removal, and the builder’s margin. It should also list allowances for items not yet chosen, such as tiles or light fittings.
Ask for a clear breakdown listing each trade and major material. A line item that says only “kitchen” with no detail is hard to check.
Common inclusions to confirm:
Some items cannot be fixed until you choose them. Two common terms cover this.
A prime cost item is an item where the contract sets a budget amount, such as a basin, a tap set or a light fitting.
A provisional sum is an estimate for work that cannot yet be fully defined, such as ground conditions or hidden structural repairs.
These sums are normal but reduce the certainty of a fixed price.
A variation is any change to the work, the contract sum, or the time for completion after signing, a new window, a moved wall, an upgraded floor covering, or a delay caused by a late owner selection. Variations are common on renovations and where most disputes start.
A builder can usually change the price only in a few situations:
A well-drafted contract sets out a repeatable process. The typical sequence is:
Disputes that reach adjudication or the courts are rarely about the size of a variation. They are about whether it was authorised at all, or whether the price was agreed before the work was done. A written variation signed before work starts removes both questions.
A variation that will survive scrutiny usually states:
If a variation is priced as a lump sum with no breakdown, ask for the breakdown. A builder who cannot explain how a variation price was reached is a builder to question.
Some variations arise without an owner request. Examples include:
In each case, the contract should say how the adjustment is calculated and what evidence the builder must provide.
The fixed price is fixed only for the scope described. Once the contract is signed, the practical discipline is:
Watch out: a series of small on-site changes approved verbally, each individually modest, can together add a significant amount to the final account. By the time the invoice arrives, the owner has no written record of what was agreed.
Residential building contracts are regulated at national level, and rules differ. Variation requirements and deposit limits differ between different parts of the UK, so check the rules that apply where your project is located.
If a variation is disputed, the contract’s dispute resolution clause governs what happens next, usually notice, a period for discussion, then referral to a regulator, adjudicator, or court.
A fixed price protects you from most day-to-day cost changes, but not always from large market shifts. Many contracts include an escalation clause, often called a rise-and-fall clause, allowing costs to be passed on in defined circumstances. This is the most misunderstood part of a fixed price contract, and where the certainty the owner thought they had can quietly disappear.
A rise-and-fall clause adjusts the contract sum after signing to reflect movements in the cost of specified inputs. The clause should identify:
A clause that allows any price change at any time, for any reason, is not really a fixed price contract. A clause that limits adjustments to documented, specific materials, measured against a stated reference point, is far more reasonable.
In practice, three arrangements appear in residential contracts:
Ask the builder which of these the contract represents and to point to the clause that says so. If the answer is vague, the contract is vague.
A practical test is to ask four questions of the clause:
A clause that fails all four is one to negotiate or walk away from. A clause that passes all four is a managed risk rather than an open-ended one.
Most practitioners find that the best protection is not a legal argument after the fact but a set of practical steps before signing:
If the clause is complex, an independent building consultant or solicitor can review it before you sign. That cost is almost always less than the cost of a disputed adjustment.
Escalation is not the only risk in a fixed price contract. Others include:
Watch out: a contract silent on escalation is not necessarily safer than one with a clause. Silence leaves the position to be argued later, and the argument usually favours the party with the better records.
Take your time with the contract. A short checklist helps you catch the most important points.

Before you choose a builder, check their licence, insurance and past work.
If something is unclear, ask for it in writing. A reputable builder will explain each term and update the document where needed.
The best way to start is with a detailed quote.
To request a quote:
For current prices or a quote, visit the Archibuilt website. When ready, ask for a renovation consultation before anything is signed.
Frequently asked questions
Does a fixed price contract mean the cost can never change?
No.
What should I check first in a contract?
Start with the contract sum, scope of works and variation process.
Last Updated: 10 November 2026
A fixed price contract sets one agreed total for the defined scope of works, so the builder carries the risk of cost overruns within that scope. A cost plus contract charges the actual cost of materials and labour plus an agreed margin, so the homeowner carries that risk. Fixed price suits projects with a clear, detailed specification. Cost plus suits projects where the scope is still being worked out. Check the contract wording to confirm which model you are signing.
Yes, but only in limited circumstances. The price can usually change through approved variations, where you request a change to the works, and through provisional sums or prime cost items that are adjusted to actual costs. Some contracts also include a material cost escalation clause. Any increase should be documented in writing and agreed before the work proceeds. Ask for the variation process to be spelled out in the contract before you sign.
Not automatically. A fixed price covers only what is listed in the scope of works and specifications. Items marked as provisional sums or prime cost items may be adjusted, and council fees, site connections and landscaping are sometimes excluded. Read the contract sum and inclusions list carefully, and ask your builder to confirm in writing what is and is not covered.
A variation is any change to the agreed scope, whether you add, remove or alter work. Each variation should be quoted in writing, approved by you before it starts, and added to the contract sum. Unapproved changes are a common source of disputes. Keep a written record of every variation, including the cost and any impact on the completion date.